Nenehatun Wind Power Plant Project, Erzurum Airport DVOR Device Signal Performance
It was applied to the General Directorate of State Airports Authority for the Nenehatun Wind Power Plant, planned to be built in Erzurum country, Nene Hatun District Uzun Ahmet Mahallesi. The cumulative effects of the turbines, on the signal performance of Erzurum VOR device, was analyzed and reported.
Erzurum Airport VOR device signal analysis simulations are reported by expert staff in nationally and internationally accepted simulation program for 9 RESs specified as T14, T15, T16, T17, T18, T19, T20, and T21.
The report has been approved by General Directorate of State Airports Authority.