Aeronautical study for Konya

Aviation Study

Batman Mosque Aviation Study Kütahya Flagpole Aviation Study MUSUL INTERNATIONAL AIRPORT Aviation Study for Vase Tower Project Iller Bank Mosque Project Aviation Study Kazan Soda Glass Factory Aviation Study Nenehatun Wind Power Plant Project, Erzurum Airport DVOR Device Signal Performance Aeronautical study for Adana Sarıçam 2. Stage Aeronautical study for Adana Sarıçam 1. Stage Aeronautical study for Konya Aeronautical study for Batman Airport Aeronautical study of Etimesgut Airport, Ergazi Imar District 44627-2 Aeronautical study for Etimesgut Airport, Ergazi Imar District 14943-2 Aeronautical study for Kahramanmaraş Airport Aeronautical Study for Merzifon Airport Bahçekent District 944 Aeronautical study for Eskişehir-Odunpazarı Aeronautical study for Etimesgut Airport, Yuva District 43256-2 Aeronautical study for Sabiha Gökçen Airport, Istanbul-Tuzla, Tepeören District 1586 Aeronautical study for Erzincan Airport Aeronautical study for Merzifon Aeronautical study for Sabiha Gökçen Airport Tepeören District 2025-2028-2074-2075 Aeronautical study for Seyhan HES-Ceylan TM -Osmaniye TM Energy Transmission Line Adana Çimento Sanayii Türk A.Ş Aeronautical Study Küçükçekmece 0 Ada 8771 Parcel Aeronautical Study Kayseri Airport Hangar Signal Analysis Project Bandırma Üniversity Mosque Project Aeronautical Study ÇORUM MERZİFON HIGH SPEED TRAIN PROJECT AERONAUTICAL STUDY Adana Saricam Municipality TOKI Aviation Works. Adana TEİAŞ Aviation Study Çiğli Airport Locaalizer Signal Analysis
 Aeronautical study for Konya

Aeronautical study for Konya

The International Civil Aviation Organization (ICAO) regulations defined in Annex 14 specify airspace around aerodromes to be maintained free from obstacles. For that purpose, virtual surfaces called “Obstacle Limitation Surface” (OLS) are described, which ideally shall not be penetrated by an object. Nevertheless – according to ICAO, EASA and many states – penetrations may be acceptable if an “aeronautical study” demonstrates that the object or obstacle has no adverse impact on the safety or regularity of flight operations. This process generally requires a specialised third-party – as Segar Engineering & Aviation – to develop the aeronautical study, which shall be later submitted and reviewed by the responsible aviation authority.

Aeronautical study and then flight safety assessments were conducted by Segar Engineering & Aviation.

There were inconsistencies between the maximum heights determined for the Konya Airport obstacle plan and the zoning plans of the city boundaries. Konya Airport Flight Procedures evaluations were made and simulation of the navigation device signal analysis was reported by experts in the simulation program, which was accepted nationally and internationally. Height problems of buildings were solved and the elevation rights were determined.

The report has been approved by Directorate General of Civil Aviation.